Work-Station (m) | Tasks assigned for each workstation | Station Time (min.) | Idle Time (min.) |
1 | 1,2,3,4 | 74.04 | 78.29 |
2 | 5,6,7,8,9,10,11,12,13 | 91.73 | 60.60 |
3 | 14,15,16,17,18,19,20,21,22,23,24,25,26,27,28,29,30,31,32,33,34,35,36,37 | 71.40 | 80.93 |
4 | 38,39,40,41,42,43,44 | 120.68 | 31.65 |
5 | 45,46,47,48,49,50,51,52,53, 54,55,56,57,58,59,60,61,62, 63 | 101.78 | 50.55 |
The total idle time (Tid) = 303.02 min., The workload variance (wv) = 333.03, The line efficiency (E) = 76.17%. |